Liang Zhang
Title
Cited by
Cited by
Year
An effective hybrid genetic algorithm for flow shop scheduling with limited buffers
L Wang, L Zhang, DZ Zheng
Computers & Operations Research 33 (10), 2960-2971, 2006
1942006
Energy-Efficient Production Systems Through Schedule-Based Operations
G Chen, L Zhang, J Arinez, S Biller
IEEE Transactions on Automation Science and Engineering 10 (1), 27-37, 2013
1292013
Transient behavior of serial production lines with Bernoulli machines
SM Meerkov, L Zhang
IIE Transactions 40 (3), 297-312, 2008
882008
Transient analysis of Bernoulli serial lines: performance evaluation and system-theoretic properties
L Zhang, C Wang, J Arinez, S Biller
IIE Transactions 45 (5), 528-543, 2013
742013
Quality/quantity improvement in an automotive paint shop: A case study
J Arinez, S Biller, SM Meerkov, L Zhang
IEEE Transactions on automation science and engineering 7 (4), 755-761, 2009
662009
Bottlenecks in Bernoulli serial lines with rework
S Biller, J Li, SP Marin, SM Meerkov, L Zhang
IEEE Transactions on Automation Science and Engineering 7 (2), 208-217, 2009
63*2009
Transient Behavior of Two-Machine Geometric Production Lines
SM Meerkov, N Shimkin, L Zhang
Automatic Control, IEEE Transactions on 55 (2), 453-458, 2010
542010
Transient performance analysis of serial production lines with geometric machines
G Chen, C Wang, L Zhang, J Arinez, G Xiao
IEEE Transactions on Automatic Control 61 (4), 877-891, 2015
502015
An adaptive genetic algorithm with multiple operators for flowshop scheduling
L Zhang, L Wang, DZ Zheng
The International Journal of Advanced Manufacturing Technology 27 (5), 580-587, 2006
482006
Product quality inspection in Bernoulli lines: analysis, bottlenecks, and design
SM Meerkov, L Zhang
International Journal of Production Research 48 (16), 4745-4766, 2010
472010
Assembly systems with non-exponential machines: Throughput and bottlenecks
SN Ching, SM Meerkov, L Zhang
Nonlinear Analysis: Theory, Methods & Applications 69 (3), 911-917, 2008
452008
A class of hypothesis-test-based genetic algorithms for flow shop scheduling with stochastic processing time
L Wang, L Zhang, DZ Zheng
The International Journal of Advanced Manufacturing Technology 25 (11), 1157 …, 2005
442005
Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks
SM Meerkov, L Zhang
Annals of Operations Research 182 (1), 119-131, 2011
432011
Finite production run-based serial lines with Bernoulli machines: Performance analysis, bottleneck, and case study
Z Jia, L Zhang, J Arinez, G Xiao
IEEE Transactions on Automation Science and Engineering 13 (1), 134-148, 2015
392015
Closed Bernoulli production lines: Analysis, continuous improvement, and leanness
S Biller, SP Marin, SM Meerkov, L Zhang
Automation Science and Engineering, IEEE Transactions on 6 (1), 168-180, 2009
392009
A class of order-based genetic algorithm for flow shop scheduling
L Wang, L Zhang, DZ Zheng
The International Journal of Advanced Manufacturing Technology 22 (11), 828-835, 2003
382003
Advances in simulation optimization
L Wang, L Zhang, D Zheng
Control and Decision 18 (3), 257-262, 2003
382003
Performance analysis for serial production lines with Bernoulli Machines and Real-time WIP-based Machine switch-on/off control
Z Jia, L Zhang, J Arinez, G Xiao
International Journal of Production Research 54 (21), 6285-6301, 2016
372016
Estimation of cell SOC evolution and system performance in module-based battery charge equalization systems
W Han, C Zou, C Zhou, L Zhang
IEEE Transactions on Smart Grid 10 (5), 4717-4728, 2018
362018
Stochastic optimization using simulated annealing with hypothesis test
L Wang, L Zhang
Applied mathematics and computation 174 (2), 1329-1342, 2006
352006
The system can't perform the operation now. Try again later.
Articles 1–20