Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method F Honari Choobar, A Nazari, E Rezaee Nik International journal of engineering 25 (2), 107-120, 2012 | 85 | 2012 |
Prioritizing agile project management strategies as a change management tool in construction projects Y Arefazar, A Nazari, MR Hafezi, SAH Maghool International Journal of Construction Management 22 (4), 678-689, 2022 | 80 | 2022 |
Fuzzy AHP model for prequalification of engineering consultants in the Iranian public procurement system A Nazari, S Vandadian, H Abdirad Journal of Management in Engineering 33 (2), 04016042, 2017 | 32 | 2017 |
Analysis of stakeholder concerns at different times of construction projects using social network analysis (SNA) M Dadpour, E Shakeri, A Nazari International Journal of Civil Engineering 17, 1715-1727, 2019 | 29 | 2019 |
An optimization framework for risk response actions selection using hybrid ACO and FTOPSIS S Shoar, A Nazari Scientia Iranica 26 (3), 1763-1777, 2019 | 21 | 2019 |
Barriers to effective implementation of quality management systems in public design projects in Iran H Abdirad, A Nazari Architectural Engineering and Design Management 11 (6), 457-474, 2015 | 18 | 2015 |
A multi-objective optimization and fuzzy prioritization approach for project risk responses selection ER Nik, SH Zegordi, A Nazari 2011 IEEE International Conference on Industrial Engineering and Engineering …, 2011 | 14 | 2011 |
CA-FCM: towards a formal representation of expert’s causal judgements over construction project changes M Shahinmoghaddam, A Nazari, M Zandieh Advanced Engineering Informatics 38, 620-638, 2018 | 11 | 2018 |
PROJECT RISK ASSESSMENT BY A HYBRID APPROACH USING FUZZY-ANP AND FUZZY-TOPSIS SH Zegordi, A Nazari, ER Nik Sharif, Industrial Engineering & Management 29 (2), 3-14, 2014 | 7 | 2014 |
Developing a RiskManagement Model for Project Based Organizations A Nazari, M Jaberi, MS Amalnick Journal of Industrial Engineering 47 (1), 93-104, 2013 | 5 | 2013 |
Developing “Risk Source” and “Risk Event” Breakdown Structures: A New Approach to Risk Identification in Complex Environments H Abdirad, A Nazari, P Gholizadeh, A Ansari International Proceedings of Economics Development and Research 45, 2012 | 5 | 2012 |
Study on the effects of Septoria leaf blotch (Septoria tritici) infection on yield reduction of wheat cultivars in Golestan province S Kia, M Torabi, A Nazari 17th Iranian plant protection congress, 4, 2006 | 5 | 2006 |
Provide a model for risk reduction in power plant project based multi-objective optimization approach and fuzzy analytic hierarchy process H Zegordi, E Rezaee, A Nazari, F Honari Energy Economics Studies 31, 95-161, 2011 | 4 | 2011 |
A Combined Fuzzy Analytic Network Process and Fuzzy-TOPSIS Model for Project Risk Assessment ER Nik, SH Zegordi, A Nazari, M Sakawa, FH Choobar International Journal of Modeling and Optimization 1 (4), 275, 2011 | 3 | 2011 |
Frequency of Tuberculous Pleural Effusion in Northeast of Iran M Towhidi, HR FARID, A Nazari IRANIAN RED CRESCENT MEDICAL JOURNAL (IRCMJ) 6 (1), 57-60, 2003 | 3 | 2003 |
Decision support system model for evaluating final year project using integrated FMCDM N Ghazali, F Ahmad, EN Madi, A Nazari, M Rose Proceeding of the International Conference on Artificial Intelligence in …, 2013 | 2 | 2013 |
Evaluation of injury in 999 casualties of the Iran-Iraq war AA Salari, A Nazari, MH Afzali KOWSAR MEDICAL JOURNAL 6 (4), 281-287, 2002 | 2 | 2002 |
Enhancing accuracy in construction overhead cost estimation: a novel integration of activity-based costing and building information modelling M Naderi, A Nazari, A Shafaat, S Abrishami Smart and Sustainable Built Environment, 2024 | 1 | 2024 |
Risk stages and factors in architectural design-A structural equation modelling S Tabarroki, A Nazari, S Banihashemi Architectural Engineering and Design Management 20 (1), 79-101, 2024 | 1 | 2024 |
Analytical Review of Risk Triggers in the Design Phase of D&B Contracts A Nazari, M Parchami Jalal, O Ahmad Soltani Amirkabir Journal of Civil Engineering 53 (7), 2869-2888, 2021 | 1 | 2021 |