Pilar Tormos
Pilar Tormos
Geverifieerd e-mailadres voor eio.upv.es - Homepage
Titel
Geciteerd door
Geciteerd door
Jaar
An assessment of railway capacity
M Abril, F Barber, L Ingolotti, MA Salido, P Tormos, A Lova
Transportation Research Part E: Logistics and Transportation Review 44 (5 …, 2008
4882008
A competitive heuristic solution technique for resource-constrained project scheduling
P Tormos, A Lova
Annals of Operations Research 102 (1-4), 65-81, 2001
2372001
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
A Lova, C Maroto, P Tormos
European journal of operational research 127 (2), 408-424, 2000
2182000
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
A Lova, P Tormos, M Cervantes, F Barber
International Journal of Production Economics 117 (2), 302-316, 2009
2092009
Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
A Lova, P Tormos
Annals of Operations Research 102 (1-4), 263-286, 2001
1702001
An efficient multi-pass heuristic for project scheduling with constrained resources
P Tormos, A Lova
International Journal of Production Research 41 (5), 1071-1086, 2003
1102003
Multi-mode resource constrained project scheduling: Scheduling schemes, priority rules and mode selection rules
A Lova, P Tormos, F Barber
Inteligencia Artificial. Revista Iberoamericana de Inteligencia Artificial …, 2006
872006
A genetic algorithm for railway scheduling problems
P Tormos, A Lova, F Barber, L Ingolotti, M Abril, MA Salido
Metaheuristics for scheduling in industrial and manufacturing applications …, 2008
862008
Project management: an evaluation of software quality
C Maroto, P Tormos
International Transactions in Operational Research 1 (2), 209-221, 1994
521994
Domain dependent distributed models for railway scheduling
MA Salidol, M Abril, F Barber, L Ingolotti, P Tormos, A Lova
International Conference on Innovative Techniques and Applications of …, 2006
442006
Domain dependent distributed models for railway scheduling
MA Salidol, M Abril, F Barber, L Ingolotti, P Tormos, A Lova
International Conference on Innovative Techniques and Applications of …, 2006
442006
Integrating heuristics for resource constrained project scheduling: One step forward
P Tormos, A Lova
Technicalreport, Department of Statistics and Operations Research …, 2003
412003
Survey of automated systems for railway management
F Barber, M Abril, MA Salido, L Ingolotti, P Tormos, A Lova
Technical Report, 2007
402007
Combining random sampling and backward-forward heuristics for resource-constrained multi-project scheduling
A Lova, P Tormos
Proceedings of the Eight International Workshop on Project Management and …, 2002
392002
The evolution of software quality in project scheduling
C Maroto, P Tormos, A Lova
Project Scheduling, 239-259, 1999
391999
An efficient method to schedule new trains on a heavily loaded railway network
L Ingolotti, F Barber, P Tormos, A Lova, MA Salido, M Abril
Ibero-American Conference on Artificial Intelligence, 164-173, 2004
342004
New heuristics to solve the “CSOP” railway timetabling problem
L Ingolotti, A Lova, F Barber, P Tormos, MA Salido, M Abril
International conference on industrial, engineering and other applications …, 2006
302006
New heuristics to solve the “CSOP” railway timetabling problem
L Ingolotti, A Lova, F Barber, P Tormos, MA Salido, M Abril
International conference on industrial, engineering and other applications …, 2006
302006
An interactive train scheduling tool for solving and plotting running maps
F Barber, MA Salido, LP Ingolotti, M Abril, AL Lova, MP Tormos
Conference on Technology Transfer, 646-655, 2003
282003
Tools for resource-constrained project scheduling and control: forward and backward slack analysis
P Tormos, A Lova
Journal of the Operational Research Society 52 (7), 779-788, 2001
242001
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–20