An assessment of railway capacity M Abril, F Barber, L Ingolotti, MA Salido, P Tormos, A Lova Transportation Research Part E: Logistics and Transportation Review 44 (5 …, 2008 | 488 | 2008 |
A competitive heuristic solution technique for resource-constrained project scheduling P Tormos, A Lova Annals of Operations Research 102 (1-4), 65-81, 2001 | 237 | 2001 |
A multicriteria heuristic method to improve resource allocation in multiproject scheduling A Lova, C Maroto, P Tormos European journal of operational research 127 (2), 408-424, 2000 | 218 | 2000 |
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes A Lova, P Tormos, M Cervantes, F Barber International Journal of Production Economics 117 (2), 302-316, 2009 | 209 | 2009 |
Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling A Lova, P Tormos Annals of Operations Research 102 (1-4), 263-286, 2001 | 170 | 2001 |
An efficient multi-pass heuristic for project scheduling with constrained resources P Tormos, A Lova International Journal of Production Research 41 (5), 1071-1086, 2003 | 110 | 2003 |
Multi-mode resource constrained project scheduling: Scheduling schemes, priority rules and mode selection rules A Lova, P Tormos, F Barber Inteligencia Artificial. Revista Iberoamericana de Inteligencia Artificial …, 2006 | 87 | 2006 |
A genetic algorithm for railway scheduling problems P Tormos, A Lova, F Barber, L Ingolotti, M Abril, MA Salido Metaheuristics for scheduling in industrial and manufacturing applications …, 2008 | 86 | 2008 |
Project management: an evaluation of software quality C Maroto, P Tormos International Transactions in Operational Research 1 (2), 209-221, 1994 | 52 | 1994 |
Domain dependent distributed models for railway scheduling MA Salidol, M Abril, F Barber, L Ingolotti, P Tormos, A Lova International Conference on Innovative Techniques and Applications of …, 2006 | 44 | 2006 |
Domain dependent distributed models for railway scheduling MA Salidol, M Abril, F Barber, L Ingolotti, P Tormos, A Lova International Conference on Innovative Techniques and Applications of …, 2006 | 44 | 2006 |
Integrating heuristics for resource constrained project scheduling: One step forward P Tormos, A Lova Technicalreport, Department of Statistics and Operations Research …, 2003 | 41 | 2003 |
Survey of automated systems for railway management F Barber, M Abril, MA Salido, L Ingolotti, P Tormos, A Lova Technical Report, 2007 | 40 | 2007 |
Combining random sampling and backward-forward heuristics for resource-constrained multi-project scheduling A Lova, P Tormos Proceedings of the Eight International Workshop on Project Management and …, 2002 | 39 | 2002 |
The evolution of software quality in project scheduling C Maroto, P Tormos, A Lova Project Scheduling, 239-259, 1999 | 39 | 1999 |
An efficient method to schedule new trains on a heavily loaded railway network L Ingolotti, F Barber, P Tormos, A Lova, MA Salido, M Abril Ibero-American Conference on Artificial Intelligence, 164-173, 2004 | 34 | 2004 |
New heuristics to solve the “CSOP” railway timetabling problem L Ingolotti, A Lova, F Barber, P Tormos, MA Salido, M Abril International conference on industrial, engineering and other applications …, 2006 | 30 | 2006 |
New heuristics to solve the “CSOP” railway timetabling problem L Ingolotti, A Lova, F Barber, P Tormos, MA Salido, M Abril International conference on industrial, engineering and other applications …, 2006 | 30 | 2006 |
An interactive train scheduling tool for solving and plotting running maps F Barber, MA Salido, LP Ingolotti, M Abril, AL Lova, MP Tormos Conference on Technology Transfer, 646-655, 2003 | 28 | 2003 |
Tools for resource-constrained project scheduling and control: forward and backward slack analysis P Tormos, A Lova Journal of the Operational Research Society 52 (7), 779-788, 2001 | 24 | 2001 |