Song Wu
Titel
Geciteerd door
Geciteerd door
Jaar
The impact of occupants’ behaviours on building energy analysis: A research review
E Delzendeh, S Wu, A Lee, Y Zhou
Renewable and Sustainable Energy Reviews 80, 1061-1071, 2017
2702017
The utilisation of building information models in nD modelling: a study of data interfacing and adoption barriers
TK Tse, KA Wong, KF Wong
Journal of information technology in construction (ITcon) 10 (8), 85-110, 2005
1902005
IFC model viewer to support nD model application
C Fu, G Aouad, A Lee, A Mashall-Ponting, S Wu
Automation in Construction 15 (2), 178-185, 2006
1622006
Application and extension of the IFC standard in construction cost estimating for tendering in China
M Zhiliang, W Zhenhua, S Wu, L Zhe
Automation in Construction 20 (2), 196-204, 2011
1612011
Process management in design and construction
R Cooper, G Aouad, A Lee, S Wu, A Fleming, M Kagioglou
Blackwell publishing, 2005
1402005
Construction risk knowledge management in BIM using ontology and semantic web technology
LY Ding, BT Zhong, S Wu, HB Luo
Safety science 87, 202-213, 2016
1382016
Automating progress measurement of construction projects
X Zhang, N Bakis, TC Lukins, YM Ibrahim, S Wu, M Kagioglou, G Aouad, ...
Automation in Construction 18 (3), 294-301, 2009
1022009
Building information models: a review on storage and exchange mechanisms
U Isikdag, G Aouad, J Underwood, S Wu
Bringing ITC knowledge to work, 2007
922007
A technical review of BIM based cost estimating in UK quantity surveying practice, standards and tools
S Wu, G Wood, K Ginige, SW Jong
Journal of Information Technology in Construction 19, 534-562, 2014
872014
Constructing the future: nD modelling
G Aouad, A Lee, S Wu
Routledge, 2006
832006
Integrating BIM and GIS for large-scale facilities asset management: a critical review
X Zhang, Y Arayici, S Wu, C Abbott, GF Aouad
752009
Optimized flowshop scheduling of multiple production lines for precast production
Z Yang, Z Ma, S Wu
Automation in Construction 72, 321-329, 2016
572016
nD modelling–a driver or enabler for construction improvement
G Aouad, R Cooper, C Fu, A Lee, A Ponting, J Tah, S Wu
RICS Research paper series 5 (6), 1-41, 2005
562005
nD modelling road map: A vision for nD-Enabled construction
A Lee, S Wu, AJ Marshall-Ponting, G Aouad, R Cooper, JHM Tah, ...
University of Salford, 2005
432005
The use of a multi‐attribute tool for evaluating accessibility in buildings: the AHP approach
S Wu, A Lee, JHM Tah, G Aouad
Facilities, 2007
422007
The utilisation of building information models in nD modelling: a study of data interfacing and adoption barriers
G Aound, A Lee, S Wu
422004
Computer aided design guide for architecture, engineering and construction
G Aouad, S Wu, A Lee, T Onyenobi
Routledge, 2013
402013
Dimensional Modeling Technology: Past, Present, and Future
G Aouad, S Wu, A Lee
Journal of Computing in Civil Engineering 20 (3), 151-153, 2006
342006
A strawberry detection system using convolutional neural networks
N Lamb, MC Chuah
2018 IEEE International Conference on Big Data (Big Data), 2515-2520, 2018
252018
IFC implementation in lifecycle costing
C Fu, G Aouad, A Ponting, A Lee, S Wu
Journal of Harbin Institute of Technology(New Series) 11 (4), 437-441, 2004
212004
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–20