Volgen
Scott S. Washburn
Scott S. Washburn
Geverifieerd e-mailadres voor ce.ufl.edu - Homepage
Titel
Geciteerd door
Geciteerd door
Jaar
Principles of highway engineering and traffic analysis
F Mannering, W Kilareski, S Washburn
John Wiley & Sons, 2007
814*2007
Statistical modeling of vehicle emissions from inspection/maintenance testing data: an exploratory analysis
S Washburn, J Seet, F Mannering
Transportation Research Part D: Transport and Environment 6 (1), 21-36, 2001
982001
Quality-of-service perceptions by rural freeway travelers: Exploratory analysis
S Washburn, K Ramlackhan, D McLeod
Transportation Research Record: Journal of the Transportation Research Board …, 2004
602004
Development and evaluation of methods for constructing breakdown probability models
A Kondyli, L Elefteriadou, W Brilon, FL Hall, B Persaud, S Washburn
Journal of Transportation Engineering 139 (9), 931-940, 2013
532013
Proactive ramp management under the threat of freeway-flow breakdown
L Elefteriadou, A Kondyli, S Washburn, W Brilon, J Lohoff, L Jacobson, ...
Procedia-Social and Behavioral Sciences 16, 4-14, 2011
522011
Rural freeway level of service based on traveler perception
SS Washburn, D Kirschner
Transportation Research Record: Journal of the Transportation Research Board …, 2006
402006
Analysis of Crashes in Freeway Work-Zone Queues: A Case Study
S Srinivasan, G Carrick, X Zhu, K Heaslip, SS Washburn
Southeastern Transportation Center, 2008
342008
Simplified highway capacity calculation method for the highway performance monitoring system
RA Margiotta, SS Washburn, C Systematics
United States. Federal Highway Administration. Office of Policy and …, 2017
302017
Freeway Capacity Estimation Method for Planning Applications
V Modi, A Kondyli, SS Washburn, DS McLeod
Journal of Transportation Engineering 140 (9), 05014004, 2014
302014
Enhancing Ramp Metering Algorithms with the Use of Probability of Breakdown Models
L Elefteriadou, A Kondyli, W Brilon, FL Hall, B Persaud, S Washburn
Journal of Transportation Engineering 140 (4), 04014003, 2014
272014
Operational performance assessment for two-lane highway facilities
Q Yu, SS Washburn
Journal of Transportation Engineering 135 (4), 197-205, 2009
262009
Variable Speed Limit (VSL)-Best Management Practice
L Elefteriadou, SS Washburn, Y Yin, V Modi, C Letter
University of Florida. Transportation Research Center, 2012
252012
Signalized intersection delay estimation: case study comparison of TRANSYT-7F, Synchro and HCS
SS Washburn, N Larson
Institute of Transportation Engineers. ITE Journal 72 (3), 30, 2002
232002
Estimating link travel time with the mobilizer video image tracking system
SS Washburn, NL Nihan
Journal of Transportation Engineering 125 (1), 15-20, 1999
231999
Performance measures on two-lane highways: Survey of practice
A Al-Kaisy, A Jafari, S Washburn, T Lutinnen, R Dowling
Research in transportation economics 71, 61-67, 2018
222018
Impact of Lane Closures on Roadway Capacity: Development of a Two-Lane Work Zone Lane Closure Analysis Procedure (Part A)
SS Washburn, T Hiles, K Heaslip
222008
Implementing two-lane highway simulation modeling into CORSIM
J Li, SS Washburn
Procedia-Social and Behavioral Sciences 16, 293-305, 2011
212011
Framework for investigation of level-of-service criteria and thresholds on rural freeways
JT Kim, KG Courage, SS Washburn, G Bonyani
Transportation research record 1852 (1), 239-245, 2003
202003
Performance measures for truck level of service: an exploratory survey analysis
B Ko, S Washburn, D McLeod
Transportation Research Record: Journal of the Transportation Research Board …, 2009
192009
Evaluation of Models to Estimate Percent Time Spent Following on Two-Lane Highways
JE Bessa Jr, JR Setti, SS Washburn
Journal of Transportation Engineering, Part A: Systems 143 (5), 04017010, 2017
182017
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–20