Volgen
Amirhossein Moosavi
Amirhossein Moosavi
Telfer School of Management, University of Ottawa
Geverifieerd e-mailadres voor uOttawa.ca
Titel
Geciteerd door
Geciteerd door
Jaar
Scheduling of elective patients considering upstream and downstream units and emergency demand using robust optimization
A Moosavi, S Ebrahimnejad
Computers & Industrial Engineering 120, 216-233, 2018
442018
A green vehicle routing problem with time windows considering the heterogeneous fleet of vehicles: two metaheuristic algorithms
N Rezaei, S Ebrahimnejad, A Moosavi, A Nikfarjam
European journal of industrial engineering 13 (4), 507-535, 2019
322019
Robust operating room planning considering upstream and downstream units: A new two-stage heuristic algorithm
A Moosavi, S Ebrahimnejad
Computers & Industrial Engineering 143, 106387, 2020
252020
An integrated dynamic facility layout and job shop scheduling problem: A hybrid NSGA-II and local search algorithm.
B Erfani, S Ebrahimnejad, A Moosavi
Journal of Industrial & Management Optimization 16 (4), 2020
172020
Staff scheduling for residential care under pandemic conditions: The case of COVID-19
A Moosavi, O Ozturk, J Patrick
Omega 112, 102671, 2022
132022
A multi-path routing-inventory problem for a closed-loop supply chain considering the heterogeneous fleet of vehicles
A Moosavi, A Nikfarjam
International Journal of Sustainable Engineering 12 (3), 174-188, 2019
102019
A bi-objective model for humanitarian logistics network design in response to post-disaster
M Zanganeh, S Ebrahimnejad, A Moosavi, H Tayebi
International Journal of Logistics Systems and Management 33 (2), 256-279, 2019
82019
An integrated (1, t) inventory policy and vehicle routing problem under uncertainty: an accelerated benders decomposition algorithm
A Nikfarjam, A Moosavi
Transportation Letters 13 (2), 104-124, 2021
72021
Computing high-quality solutions for the patient admission scheduling problem using evolutionary diversity optimisation
A Nikfarjam, A Moosavi, A Neumann, F Neumann
International Conference on Parallel Problem Solving from Nature, 250-264, 2022
42022
A proposed grey fuzzy multi-objective programming model in supplier selection: a case study in the automotive parts industry
S Ebrahimnejad, V Rahimi, SA Moosavi
International Journal of Logistics Systems and Management 29 (4), 409-435, 2018
42018
A new multi-objective mathematical model for supplier selection in uncertain environment
SA Moosavi, S Ebrahimnejad
13th International Conference on Industrial Engineering (IIEC 2017), 2017
42017
Metaheuristics for the operating theater planning and scheduling: a systematic review
A Moosavi, O Ozturk
arXiv preprint arXiv:2008.04970, 2020
32020
Learning-Based Planning and Scheduling in Healthcare
A Moosavi
Université d'Ottawa/University of Ottawa, 2023
2023
Behavior of power plants in collusion and competitive markets considering external costs
M Peyravan, S Ebrahimnejad, A Moosavi
arXiv preprint arXiv:2008.04981, 2020
2020
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–14