Follow
foroogh abasian
foroogh abasian
PhD, Operation reasearch and data modeling scientist, FPInnovations
Verified email at ulaval.ca
Title
Cited by
Cited by
Year
Minimizing total weighted late work in the resource-constrained project scheduling problem
M Ranjbar, S Hosseinabadi, F Abasian
Applied Mathematical Modelling 37 (23), 9776-9785, 2013
282013
Forest fibre network design with multiple assortments: a case study in Newfoundland
F Abasian, M Rönnqvist, M Ouhimmou
Canadian Journal of Forest Research 47 (9), 1232-1243, 2017
232017
Forest bioenergy network design under market uncertainty
F Abasian, M Rönnqvist, M Ouhimmou
Energy 188, 116038, 2019
162019
Minimizing the total weighted late work in scheduling of identical parallel processors with communication delays
F Abasian, M Ranjbar, M Salari, M Davari, SM Khatami
Applied Mathematical Modelling 38 (15-16), 3975-3986, 2014
152014
Game—The transportation game
F Abasian, M Rönnqvist, P Marier, D Fjeld
INFORMS Transactions on Education 21 (1), 52-63, 2020
62020
Integrated network design for forest bioenergy value chain-decisions support system for the transformation of the Canadian forest industry
F Abasian, M Rönnqvist, M Ouhimmou
Université Laval, 2018
42018
Designing forest biomass value chain under uncertainty
F Abasian, M Rönnqvist, M Ouhimmou
11th International Industrial Engineering Conference, 26-28, 2015
42015
Predicting the wood mean moisture content in a conventional kiln-based drying process: A data-driven approach
M Laaroussi, L Benabbou, M Ouhimmou, F Abasian, S Haddad
IFAC-PapersOnLine 55 (10), 1447-1452, 2022
22022
Automatic state matching gaussian process ensemble for wood planer control
JT Sexton, M Morin, R Georges, F Abasian, J Gaudreault
IFAC-PapersOnLine 55 (10), 625-630, 2022
22022
Wood planer control: Predictive and prescriptive approaches via Automatic State Matching Gaussian processes
JT Sexton, M Morin, R Georges, F Abasian, J Gaudreault
Engineering Applications of Artificial Intelligence 132, 107843, 2024
2024
Forest bioenergy network design under uncertainty
F Abasian, M Ronnqvist, M Ouhimmou
INSA Lyon, 2018
2018
Forest biomass value chain design
F Abasian, M Ronnqvist, M Ouhimmou
MOSIM, 2016
2016
The system can't perform the operation now. Try again later.
Articles 1–12