Volgen
majid parchamijalal
Titel
Geciteerd door
Geciteerd door
Jaar
Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol
P Shahsavand, A Marefat, M Parchamijalal
Engineering, Construction and Architectural Management 25 (4), 497-533, 2018
1182018
Identifying organizational variables affecting project management office characteristics and analyzing their correlations in the Iranian project-oriented organizations of the …
MP Jalal, SM Koosha
International Journal of Project Management 33 (2), 458-466, 2015
992015
4D-BIM dynamic time–space conflict detection and quantification system for building construction projects
A Mirzaei, F Nasirzadeh, M Parchami Jalal, Y Zamani
Journal of construction engineering and management 144 (7), 04018056, 2018
742018
A hybrid SD-DEMATEL approach to develop a delay model for construction projects
M Parchami Jalal, S Shoar
Engineering, Construction and Architectural Management 24 (4), 629-651, 2017
592017
A hybrid framework to model factors affecting construction labour productivity: Case study of Iran
M Parchami Jalal, S Shoar
Journal of Financial Management of Property and Construction 24 (3), 630-654, 2019
412019
Root Cause Analysis of the Most Frequent Claims in the Building Industry through the SCoP3E Ishikawa Diagram
M Parchami Jalal, E Noorzai, T Yavari Roushan
Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2019
402019
A BIM-based construction claim management model for early identification and visualization of claims
M Parchami Jalal, T Yavari Roushan, E Noorzai, M Alizadeh
Smart and Sustainable Built Environment 10 (2), 227-257, 2021
392021
Modeling cost overrun in building construction projects using the interpretive structural modeling approach: a developing country perspective
S Shoar, TW Yiu, S Payan, M Parchamijalal
Engineering, Construction and Architectural Management 30 (2), 365-392, 2023
292023
Integration of project management services for International Engineering, Procurement and Construction projects
P Amirtash, M Parchami Jalal, MB Jelodar
Built Environment Project and Asset Management 11 (2), 330-349, 2021
192021
Model for preparing optimal contracts to prevent or reduce claims in projects
M Parchami Jalal, H Moharreri
Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2020
122020
Identification and analysis of owner-induced problems in design–build project lifecycle
M Hoseingholi, MP Jalal
Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2017
122017
Construction projects risk assessment based on fuzzy AHP
AS Gohar, M Khanzadi, MP Jalal, AAS Javid
2009 IEEE Student Conference on Research and Development (SCOReD), 570-573, 2009
112009
Fuzzy assessment of causes of time overrun (delays) in Irans dam construction projects
P Ghoddosi, M P Jalal, M Hosseinalipour
Journal of Applied Sciences 8 (19), 3423-3430, 2008
102008
The decision matrix approach to dealing with delays in construction projects
M Parchamijalal, P Shahsavand
Proceedings of the International Conference on Management and Dynamic Economics, 2016
82016
Contractual risks of BIM implementation and the proposed contract form for DBB and DB projects
A Mahdian, M Parchami Jalal, T Yavari Roushan
Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2023
72023
Challenges of the engineering design partnership group in design-build contracts
M Parchami Jalal, S Nikkhou, M Hoseingholi
Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2020
52020
Examination and Classification of the causes of creating delays in construction projects in Iran and comparative analysis techniques delay with SCL protocol
M Parchamijalal, P Shahsavand, A Marefat
Proceedings of the 11th International Conference of Project Management, 2015
52015
Development of a fuzzy risk assessment and contractual allocation model for Iran's dam construction projects
MP Jalal, P Ghoddosi, M Hosseinalipour
1st International Conference on Construction in Developing Countries, 366-375, 2008
52008
Risk Analysis in Implementing Building Energy Performance Projects: Hybrid DANP-VIKOR Model Analysis—A Case Study in Iran
H Naderi, MH Heydari, M Parchami Jalal
Buildings 13 (8), 2066, 2023
32023
Claim management office maturity model (CMOMM) in project-oriented organizations in the construction industry
M Parchamijalal, S Moradi, M Zabihi Shirazi
Engineering, Construction and Architectural Management 30 (1), 74-104, 2023
32023
Het systeem kan de bewerking nu niet uitvoeren. Probeer het later opnieuw.
Artikelen 1–20